首页> 外文期刊>Rail Business Intelligence >Reading station contractor selected
【24h】

Reading station contractor selected

机译:阅读站承包商选定

获取原文
获取原文并翻译 | 示例
       

摘要

Network Rail announced on June 9 that it had appointed a joint venture of Costain and Hochtief as preferred contractor to rebuild Reading station. Worth £80m, the contract is one of the largest to be awarded under the £850m remodelling project (RB1391 p4). The contract involves the creation of four more through tracks past two new island platforms on the north side of the station. At present, there are only four platforms with through tracks: 4, 5, 8 and 9 which essentially serve the Down and Up Main (Fast) and Relief (Slow) lines on the Great Western Main Line.
机译:Network Rail在6月9日宣布,它已任命Costain和Hochtief的合资企业为重建Reading Station的首选承包商。该合同价值8000万英镑,是8.5亿英镑改建项目(RB1391 p4)授予的最大合同之一。该合同涉及通过车站北侧的两个新的岛台再建造四个直通车道。目前,只有四个具有直通车道的平台:4、5、8和9,它们实质上服务于Great Western Main Line的上下主(快)线和救济(慢)线。

著录项

  • 来源
    《Rail Business Intelligence》 |2011年第392期|p.2|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:14:50

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号