首页> 外文期刊>Rail Business Intelligence >Loughor viaduct to be replaced
【24h】

Loughor viaduct to be replaced

机译:Loughor高架桥将被更换

获取原文
获取原文并翻译 | 示例
       

摘要

Network Rail has received planning consent from Carmarthenshire Council to replace the Grade ll-listed Loughor viaduct with a new structure. This clears the way for a £40m project will see a 6 mile single-track bottleneck in the main line between Swansea and Llanelli restored to double track, allowing more trains to be scheduled and improving reliability (RB1405 p2). The 215 m long viaduct was built for double track, but its current condition is such that it could not safely support two tracks once again. Hence a new double-track structure is to be constructed alongside at a cost of £16m which NR will fund.
机译:Network Rail已获得Carmarthenshire Council的规划同意,将以新结构取代ll级列出的Loughor高架桥。这为一个耗资4000万英镑的项目扫清了道路,将在斯旺西和拉内利之间的干线上出现6英里单轨瓶颈,恢复为双轨,从而可以安排更多列车并提高可靠性(RB1405 p2)。 215 m长的高架桥是为双轨建造的,但目前的状况使得它无法安全地再次支撑两条轨道。因此,新的双轨结构将与NR共同出资1600万英镑建造。

著录项

  • 来源
    《Rail Business Intelligence》 |2012年第416期|p.9|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:14:19

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号