【24h】

PRM TSI at ScotRail

机译:ScotRail的PRM TSI

获取原文
获取原文并翻译 | 示例
       

摘要

On October 4 Eversholt Rail announced completion of a C6 overhaul programme for the 22 three-car Class 320 EMUs leased to ScotRail, including accessibility work to achieve PRM TSI compliance. Undertaken by Wabtec in Don-caster at a cost of £7·2m, the programme has included the installation of toilets 'following a review of National Passenger Survey results which showed customers' dissatisfaction with trains that do not have toilets'. New saloon doors have been installed to improve reliability, alongside the renewal of air valves and corrosion repairs.
机译:10月4日,Eversholt Rail宣布完成了对租给ScotRail的22辆三厢320级EMU的C6检修计划,其中包括为达到PRM TSI要求而进行的无障碍工作。由Wabtec在唐卡斯特进行的一项耗资700万英镑的计划包括“在对国家乘客调查结果进行了审查之后显示出客户对没有厕所的火车的不满”的厕所安装。安装了新的轿车门以提高可靠性,同时还更新了空气阀并进行了腐蚀修复。

著录项

  • 来源
    《Rail Business Intelligence》 |2013年第448期|6-6|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:13:39

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号