【24h】

Subway rethink

机译:地铁的反思

获取原文
获取原文并翻译 | 示例
       

摘要

Strathclyde Partnership for Transport has dropped plans to award a single turnkey contract for the tunnel infrastructure and trackwork element of the £288m Glasgow Subway modernisation programme. The contract covering tunnel lining works, drainage improvements and track renewals had been planned to run for three to four years, with an expected value of £20m to £25m and an option for subsequent maintenance. A single bid was received in response to the call for tenders, but SPT decided not to proceed to awarding a contract because of the lack of competition and the difficulty of assessing value for money.
机译:斯特拉斯克莱德交通运输合作伙伴计划放弃了授予价值2.88亿英镑的格拉斯哥地铁现代化计划的隧道基础设施和轨道工程单项总包合同的计划。该合同涵盖隧道衬砌工程,排水系统改进和轨道更新,计划执行三至四年,预计价值在2000万至2500万英镑之间,并可以选择进行后续维护。为响应招标,仅收到了一个投标,但SPT决定不进行合同授予,因为缺乏竞争并且难以评估物有所值。

著录项

  • 来源
    《Rail Business Intelligence》 |2013年第443期|5-5|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:13:35

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号