...
首页> 外文期刊>Rail Business Intelligence >Virgin challenges NR over WCML paths
【24h】

Virgin challenges NR over WCML paths

机译:Virgin在WCML路径上挑战NR

获取原文
获取原文并翻译 | 示例
           

摘要

Virgin Trains has now taken Network Rail's decision to refuse paths for the proposed twice-daily services to Shrewsbury and Blackpool North (RBl440 p4) to the Access Disputes Committee. Still confident that the eight paths requested are fully compliant and will not have a negative impact on WCML performance, Virgin remains optimistic that it will be able to introduce the new services as planned this December. Virgin Trains Chief Operating Officer Chris Gibb told RBI: 'not only have we carefully modelled these paths, but Network Rail is talking about a risk to PPM on the WCML from these trains but has failed to acknowledge the improvements that should be achieved from other changes to our services such as the integration of the Birmingham - Scotland services with West Midlands - Euston trains. This will have a significant impact on the heavily-congested route between Birmingham and Wolverhampton through the reduction of the number of trains we operate on that section'.
机译:维珍火车公司现已采取Network Rail的决定,拒绝将拟议的每天两次开往Shrewsbury和Blackpool North(RBl440 p4)的服务的路线通向交通争端委员会。维珍航空仍然对所请求的八条路径完全合规且不会对WCML性能产生负面影响充满信心,但维珍航空仍然乐观地表示,它将能够按计划于12月推出新服务。维珍列车首席运营官克里斯·吉布(Chris Gibb)告诉印度储备银行:“我们不仅对这些路径进行了建模,而且Network Rail还在谈论这些列车在WCML上对PPM带来的风险,但未能承认应通过其他变更来实现的改进我们的服务,例如将伯明翰-苏格兰的服务与西米德兰兹-尤斯顿的火车整合在一起。通过减少我们在该地区运营的火车数量,这将对伯明翰至沃尔夫汉普顿之间交通拥挤的路线产生重大影响。

著录项

  • 来源
    《Rail Business Intelligence》 |2013年第441期|2-2|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号