首页> 外文期刊>Rail Business Intelligence >GN/GE upgrade continues
【24h】

GN/GE upgrade continues

机译:GN / GE升级继续

获取原文
获取原文并翻译 | 示例
       

摘要

Following a 10-day closure between Lincoln and Spalding last month, 19 miles of new signalling has been commissioned under the programme to upgrade the Great Northern/Great Eastern Joint Line for freight traffic that at present uses the East Coast Main Line between Doncaster and Peterborough. 'Our engineers have installed modern signals which will help to allow for future increases in services as well as improving reliability', said Network Rail Route Managing Director, London North Eastern, Phil Verster. 'At the same time, the level crossings at Scopwick, Row-ston, Blankney and Sleaford North have been upgraded with the latest technology.'
机译:在上个月林肯和斯伯丁之间关闭了10天之后,根据该计划委托进行19英里的新信号传输,以升级大北方/大东方联合线的货运量,该运输目前使用唐卡斯特和彼得伯勒之间的东海岸干线。 “我们的工程师已经安装了现代信号,这将有助于将来增加服务并提高可靠性”,伦敦东北铁路网董事总经理Phil Verster说。 “与此同时,Scopwick,Row-ston,Blankney和Sleaford North的平交道口已经升级为最新技术。”

著录项

  • 来源
    《Rail Business Intelligence》 |2014年第461期|3-3|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:12:50

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号