首页> 外文期刊>Rail Business Intelligence >PPM diverging from improvement trajectory
【24h】

PPM diverging from improvement trajectory

机译:PPM与改进轨迹不符

获取原文
获取原文并翻译 | 示例
       

摘要

When it became clear during the 2013 Periodic Review that Network Rail would fail to meet its PPM target for the end of Control Period 4, ORR was forced to recalibrate its proposed PPM trajectory for CP5. This concession set lower targets for the first three years of CP5 during which performance could recover. It assumed that by Year 4 of CP5 (2017-18), the PPM would have reached the 92.4% specified in ORR's draft determination, before a further improvement to reach the target for the end of CP5.
机译:当在2013年定期审核中明确得知Network Rail在控制期4的末期将无法实现其PPM目标时,ORR被迫重新校准其针对CP5的PPM拟议轨迹。此特许权为CP5的前三年设定了较低的目标,在此期间性能可以恢复。它假设到CP5的第4年(2017-18年),PPM将达到ORR决定草案中指定的92.4%,然后再进一步改进以达到CP5的目标。

著录项

  • 来源
    《Rail Business Intelligence》 |2016年第516期|6-6|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:11:35

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号