首页> 外文期刊>Rail Business Intelligence >c2c revises new timetable
【24h】

c2c revises new timetable

机译:C2C修改新时间表

获取原文
获取原文并翻译 | 示例
       

摘要

On January 4 c2c introduced a further round of operational amendments, including changes to train lengths, having monitored the performance of its new timetable introduced on December 13. Despite already having made some changes, c2c acknowledged that certain services were particularly overcrowded, as passenger feedback had indicated. The new timetable had been introduced last year with the aim of providing a seat for more passengers travelling the longest distances, increasing the number of departures for London in the morning peak by 50% at Chafford Hundred and Ockendon, 45% at Basildon and 30% at leigh-on-Sea and Benfleet. In total, 1 400 extra seats were provided into Fenchurch Street during the morning peak 'and room for 3 000 more passengers'.
机译:1月4日,c2c引入了另一轮运营修订,包括更改火车长度,并监视了12月13日推出的新时间表的绩效。尽管已经进行了一些更改,c2c承认某些服务特别拥挤,因为乘客反馈表示。新的时间表已于去年推出,目的是为更多的乘客提供最长距离的座位,从而使Chafford Hundred和Ockendon早上高峰到达伦敦的出发人数增加50%,Basildon上升45%,Basildon上升30%在海上利和本弗利特。早上高峰期,Fenchurch街总共增加了1400个座位,“并为3000多名乘客提供了空间”。

著录项

  • 来源
    《Rail Business Intelligence》 |2016年第501期|4-4|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:11:30

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号