【24h】

Lea Valley upgrade

机译:利谷升级

获取原文
获取原文并翻译 | 示例
           

摘要

In preparation for laying a third track on the West Anglia Main Line between Stratford and Angel Road, during a 49 h possession over the weekend of November 4 to 5 Network Rail and its contractor Volker-Fitzpatrick removed a 125 tonne bridge span that had formerly carried the railway over the River Lea Navigation. A replacement bridge is to be installed early next year to accommodate the new third track, with a total length of 5•5 km, that will enable two additional trains/h to operate in the peaks between Stratford and Angel Road. The upgrade is being undertaken under the £170m Lea Valley Rail Programme, due for completion in 2019 and funded by the government, the Mayor of London, the London Economic Action Partnership and TfL, as well as Enfield and Haringey councils.
机译:为了准备在斯特拉特福德和天使路之间的西英吉利干线上铺设第三条铁轨,11月4日至5日周末,在49小时的占有时间内,Network Rail及其承包商Volker-Fitzpatrick拆除了一座125吨的桥跨利河航行铁路。明年年初将安装替换桥,以容纳新的第三条轨道,总长度为5•5公里,这将使每小时两班额外的列车能够在斯特拉特福德和天使之路之间的山峰上运行。此次升级是在1.70亿英镑的利娅谷铁路计划下进行的,该计划将于2019年完成,并由政府,伦敦市市长,伦敦经济行动伙伴关系和TfL以及恩菲尔德和哈林基议会资助。

著录项

  • 来源
    《Rail Business Intelligence》 |2017年第546期|7-7|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号