首页> 外文期刊>Rail Business Intelligence >Loop track renewals get underway
【24h】

Loop track renewals get underway

机译:循环赛道续订正在进行

获取原文
获取原文并翻译 | 示例
       

摘要

As Network Rail undertakes Phase 1 of a six-month programme to replace the concrete track slab in the single-track tunnel forming a loop under central Liverpool, Merseyrail Wirral Line services are terminating at Birkenhead Central and Birkenhead North from January 3 to February 12. Under Phase 2 from February 13 to May 29, on weekdays services will run as far as James Street in Liverpool. At weekends, trains will terminate at Birkenhead Central and Birkenhead North, with the exception of bank holiday weekends and April 8 when the Grand National is due to be held at Aintree.
机译:由于Network Rail正在进行为期六个月的计划的第一阶段,以替换形成在利物浦中心下的环路的单线隧道中的混凝土轨道板,因此Merseyrail Wirral Line服务将于1月3日至2月12日在Birkenhead Central和Birkenhead North终止。在2月13日至5月29日的第二阶段中,工作日的服务将一直运行到利物浦的James Street。在周末,火车将在Birkenhead Central和Birkenhead North终止,银行假日周末和4月8日大国民党将在Aintree举行时除外。

著录项

  • 来源
    《Rail Business Intelligence》 |2017年第525期|2-2|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:10:49

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号