...
首页> 外文期刊>Radwaste Solutions >Transporting the Moab Uranium Mill Tailings to White Mesa Mill by Slurry Pipeline
【24h】

Transporting the Moab Uranium Mill Tailings to White Mesa Mill by Slurry Pipeline

机译:通过浆液管道将摩押铀矿的尾矿运输到White Mesa磨

获取原文
获取原文并翻译 | 示例
           

摘要

The Atlas Minerals Corp. uranium ore processing mill was located on the west bank of the Colorado River, about three miles northwest of Moab, Utah (see Fig. 1). Processing more than 10 million tons of ore at the Atlas mill generated the pile of tailings that is now the object of final closure and remediation investigations by the U.S. Department of Energy. The pile covers approximately 130 acres, rises 90 feet above the river terrace, and is approximately 750 ft from the river (see Fig. 2). The total volume of mill tailings, which are fine-grained silty sands or clayey silts, is reported to be approximately 10.5 million tons of actual processed tailings, but the total volume of tailings, mill debris, embankment material, cover material, and contaminated site soils that have been placed over the tailings is estimated to be in excess of 13 million tons.
机译:Atlas Minerals Corp.铀矿选矿厂位于科罗拉多河西岸,位于犹他州摩押西北约三英里处(见图1)。在阿特拉斯(Atlas)工厂处理超过1000万吨的矿石会产生一堆尾矿,现在这些尾矿成为美国能源部最终关闭和修复调查的对象。该桩占地约130英亩,在河阶以上高出90英尺,距河约750英尺(见图2)。据报道,细粒粉质粉砂或黏土粉矿的尾矿总产量约为1050万吨实际加工尾矿,但尾矿,碎屑,路堤材料,覆盖材料和污染场地的总量尾矿上的土壤估计超过1300万吨。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号