...
首页> 外文期刊>Quarry Management >By-product to Commercial Output
【24h】

By-product to Commercial Output

机译:副产品到商业产出

获取原文
获取原文并翻译 | 示例
           

摘要

More than 200,000 tonnes of material have passed through the CDE washing plant at Irish Asphalt's Duleek Quarry, in Co. Meath, since its installation in the summer of 2003. In July 2004 the plant's ownership will transfer to Irish Asphalt, part of the Lagan Holdings Group, having been operated on a price-per-tonne basis by CDE since its installation. The Euro 1.5 million contract represented a major investment for Northern Ireland company CDE, and while their processing systems have previously been chosen for applications ranging from specialist sand classification to quarry-dust washing, the raw material at Duleek provided them with a considerable challenge.
机译:自2003年夏季安装以来,已有超过20万吨的材料通过位于爱尔兰米斯(Coath)Co. Meath的爱尔兰沥青(Duleek Quarry)的CDE洗涤厂。2004年7月,该厂的所有权将移交给爱尔兰石油(Lagan Holdings的一部分)自安装以来,CDE已按吨价经营该集团。 150万欧元的合同是北爱尔兰公司CDE​​的一项重大投资,尽管以前选择其处理系统来进行从专业砂分类到采石场粉尘洗涤的应用,但Duleek的原材料给他们带来了巨大挑战。

著录项

  • 来源
    《Quarry Management》 |2004年第6期|p.13-17|共5页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 矿业工程;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号