...
首页> 外文期刊>Quarry Management >Success for Armcon Cementech on M5 project
【24h】

Success for Armcon Cementech on M5 project

机译:Armcon Cementech在M5项目上取得成功

获取原文
获取原文并翻译 | 示例
           

摘要

Over the next 15 years, the steel barriers that run along nearly all motorway central reservations will be replaced with a new concrete safety barrier. Known as the 'Step Barrier', this technologically advanced restraint is said to offer improved safety over steel barriers for motorists and motorway maintenance teams.rnThe concrete for the new safety barrier is a C28/35 air-entrained fibre mix, with a specific slump required to allow the mix to be processed via a barrier slip-forming unit. A recent project on a section of the M5 motorway saw around 3,000m~3 of material used to replace a steel central barrier.
机译:在接下来的15年中,几乎所有高速公路中央保护区的钢制护栏都将被新的混凝土安全护栏所取代。这种技术先进的约束装置被称为“阶梯障碍物”,可以为驾车者和高速公路维护团队提供比钢质障碍物更高的安全性。rn新型安全障碍物的混凝土是C28 / 35夹带空气的纤维混合物,具有特定的坍落度。要求允许通过阻隔滑移成型单元处理混合物。最近在M5高速公路的一部分上进行的一项工程看到了约3,000m〜3的材料用于替代钢制中央护栏。

著录项

  • 来源
    《Quarry Management》 |2010年第12期|p.27|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号