首页> 外文期刊>Quarry Management >SPP Pumps invest in high-capacity test well facility
【24h】

SPP Pumps invest in high-capacity test well facility

机译:SPP Pumps投资于大容量测试井设施

获取原文
获取原文并翻译 | 示例
           

摘要

SPP Pumps have invested in a multi-million pound upgrade to the test facility at their headquarters in Coleford, Gloucestershire, meaning rigorous testing of pumps and systems can be carried out more quickly, efficiently and cost-effectively than ever before. The state-of-the-art facility now boasts a new 6m test well with the capacity to hold 1 million litres of water. It is equipped with everything needed to handle the testing of up to 150 different pumps or complete systems each year, covering all industry sectors.
机译:SPP泵业已对其位于格洛斯特郡科尔福德的总部的测试设施进行了数百万英镑的升级改造,这意味着对泵和系统的严格测试可以比以往任何时候都更快,更有效和更具成本效益地进行。先进的设施现在拥有600万升的新测试井,可容纳100万升水。它配备了处理所有行业的多达150种不同泵或完整系统的测试所需的一切。

著录项

  • 来源
    《Quarry Management》 |2015年第7期|32-32|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号