首页> 外文期刊>Quarry Management >CMB International put CEMEX Northfleet operation back on track
【24h】

CMB International put CEMEX Northfleet operation back on track

机译:招银国际让CEMEX Northfleet的运营重回正轨

获取原文
获取原文并翻译 | 示例
           

摘要

CMB International have recently completed a complete refurbishment of a Cedarapids twin-deck 20ft x 6ft primary rinsing screen at CEMEX UK's Northfleet Wharf marine aggregates facility on the south bank of the river Thames, in Kent. The busy wharf supplies an on-site ready-mixed concrete plant, bagging plant and block-making plant, as well as external ready-mixed concrete plants in the area. As-dredged marine sand and gravel that arrives from the Thames estuary and dredging areas off the south coast is fed from stockpiles to a 350-400 tonnes/h plant which features twin aggregate processing lines. Although the eight-year-old plant has performed well, in recent times the screens have suffered from consistent ongoing issues. With one of the primary rinsing screens in need of urgent attention, the Northfleet team invited several companies, including CMB International, to tender for a complete refurbishment of the failing screen.
机译:CMB International最近在肯特郡泰晤士河南岸的CEMEX UK Northfleet Wharf海洋集料设施上完成了Cedarapids双甲板20ft x 6ft初级冲洗筛的全面整修。繁忙的码头为该地区提供现场预拌混凝土厂,制袋厂和砌块厂,以及外部预拌混凝土厂。来自泰晤士河河口和南海岸外疏areas区域的疏marine海沙和砾石从库存中进料至每小时350-400吨的工厂,该工厂设有双骨料生产线。尽管这家已有八年历史的工厂表现良好,但最近一段时间以来,屏幕一直受到持续不断的问题困扰。 Northfleet团队在其中一个急需冲洗的筛子上得到了紧急关注,邀请了包括CMB International在内的数家公司进行招标,以对故障筛子进行全面翻新。

著录项

  • 来源
    《Quarry Management》 |2015年第7期|19-19|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号