...
首页> 外文期刊>Quarry Management >Tesab Trackstack working on key Manchester rail project
【24h】

Tesab Trackstack working on key Manchester rail project

机译:Tesab Trackstack致力于曼彻斯特重要铁路项目

获取原文
获取原文并翻译 | 示例
           

摘要

Finlay Hire - part of the Finlay Group of companies - are helping to take the strain out of a major rail works project for Skanska BAM. The civil engineering company is seeing significant efficiency on site after hiring a Tesab Trackstack 8042T stockpiler from Finlay Hire through long-term contractors Hawk Plant. Working in Manchester, the machine is conveying rail ballast from ground level to the new Ordsall Chord, which is being constructed as part of Network Rail's Great North Rail Project. The development will connect Manchester Piccadilly and Manchester Victoria stations, open up new direct links to Manchester airport from the north and reduce congestion at Piccadilly.
机译:Finlay Hire(Finlay集团公司的一部分)正在帮助减轻Skanska BAM的一项主要铁路工程项目的负担。这家土木工程公司在通过长期承包商Hawk Plant从Finlay Hire租用了Tesab Trackstack 8042T库存机后,看到了现场显着的效率。该机器在曼彻斯特工作,将地面的镇流器从地面输送到新的Ordsall Chord,后者是Network Rail大北铁路项目的一部分。该开发项目将连接曼彻斯特皮卡迪利车站和曼彻斯特维多利亚车站,开辟新的从北部到曼彻斯特机场的直接连接,并减少皮卡迪利车站的交通拥堵。

著录项

  • 来源
    《Quarry Management》 |2018年第4期|26-26|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号