首页> 外文期刊>Quality Assurance >BUILDING THE AIRPLANE IN FLIGHT: AN AUDITING APPROACH TO QUALITY MANAGEMENT SYSTEM DEVELOPMENT
【24h】

BUILDING THE AIRPLANE IN FLIGHT: AN AUDITING APPROACH TO QUALITY MANAGEMENT SYSTEM DEVELOPMENT

机译:飞行中的飞机建造:质量管理系统开发的审核方法

获取原文
获取原文并翻译 | 示例
           

摘要

In June of 2000, Maine DEP (in company with the other five New England states) found itself under EPA pressure to develop and document a quality management system by the end of the calendar year. In the frenzy that followed, the Department decided to use a private sector model for system development that called for a prospectively-focused QM plan that would be implemented through formal auditing. That is, instead of trying in advance to identify all the deficits in departmental quality management, and then assigning individuals and task groups to create structures to fill the gaps, Maine's QMP specifies the future desired system in broad terms. ME-DEP then uses its own cadre of trained auditors to assess current practice against the "condition expected" in the QMP, knowing that in many cases basic quality management practices will need to be developed. This approach assists program managers, particularly (but not exclusively) in areas sensitive to environmental data standards, in creating systems and practices that are rooted in reality, and that are perceived to add value to the Department's core work instead of just additional paperwork. Audit reports create a continuous feedback loop assuring that written procedures document actual operations. Finally, the results of auditing identify areas in which the QM system (and its plan) should be elaborated or refined, which leads to an iterative process by which quality approaches are infused in all areas of DEP operations. In the twelve months following EPA-Region I's initial approval of Maine's QMP, a total of seven audits were completed at various program levels, including two focused on critical QMP elements: Documents and Records; and Computer Hardware/Software. This paper will briefly describe the background and implementation of this approach; identify some of the factors which led to success; and describe, using selected examples, some of the early outcomes of the program.
机译:2000年6月,缅因州DEP(与其他五个新英格兰州一起)发现自己受到EPA的压力,要求在日历年末之前开发和记录质量管理体系。在随后的狂潮中,美国商务部决定使用私人部门的系统开发模型,该模型要求针对前瞻性的质量管理计划,该计划将通过正式审核来实施。也就是说,缅因州的质量管理计划不是先尝试找出部门质量管理中的所有缺陷,然后分配人员和任务组来创建填补空白的结构,而是广义地指定了未来所需的系统。然后,ME-DEP使用自己的训练有素的审核员队伍,根据QMP中的“预期条件”评估当前的实践,因为他们知道在许多情况下需要制定基本的质量管理实践。这种方法可帮助计划经理,特别是(但不仅限于)对环境数据标准敏感的领域,创建扎根于现实的系统和实践,这些系统和实践被认为可以为美国商务部的核心工作增加价值,而不仅仅是增加书面工作。审核报告会创建一个连续的反馈循环,以确保书面程序记录了实际操作。最后,审核结果确定了应制定或完善QM系统(及其计划)的领域,这导致了一个迭代过程,通过该过程将质量方法注入DEP运营的所有领域。在EPA-Region I首次批准缅因州的QMP之后的十二个月中,在各个计划级别共完成了七项审核,其中两项针对QMP的关键要素。和计算机硬件/软件。本文将简要介绍这种方法的背景和实现;确定导致成功的一些因素;并使用选定的示例描述该计划的一些早期成果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号