...
首页> 外文期刊>Quality and Reliability Engineering International >One-sided Control Charts Based on Precedence and Weighted Precedence Statistics
【24h】

One-sided Control Charts Based on Precedence and Weighted Precedence Statistics

机译:基于优先级和加权优先级统计的单侧控制图

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

In this paper, we study one-sided control charts based on precedence statistics. Because we focus on the problem of detecting 'smaller' lifetime than expected, we consider only one-sided control charts that have not received much attention in the literature. Alarm rate and average run length are derived when the process is in control and also when the process is out of control for two Lehmann alternatives. On the basis of the alarm rate and average run length, we propose suitable randomized procedures to determine the best precedence control chart. Control charts based on weighted precedence statistics are then studied. The charts developed here are illustrated with coal mining disasters data. Finally, a comparison of the performance of these two charts is made with that of a Wilcoxon-Mann-Whitney control chart and a cumulative sum chart based on the precedence statistic, and some conclusions are drawn.
机译:在本文中,我们研究基于优先级统计的单侧控制图。因为我们专注于检测比预期的“更短”寿命的问题,所以我们只考虑单侧控制图,这些单向控制图在文献中并未引起太多关注。当过程处于受控状态时,以及两个过程都无法控制时,都会得出警报率和平均运行时间。根据警报率和平均运行时长,我们提出合适的随机程序来确定最佳优先控制图。然后研究基于加权优先级统计的控制图。这里开发的图表以煤矿灾害数据为例。最后,将这两个图表的性能与基于先验统计的Wilcoxon-Mann-Whitney控制图和累积和图进行比较,并得出一些结论。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号