...
首页> 外文期刊>Public works >Cutting a big job down to size
【24h】

Cutting a big job down to size

机译:缩减工作规模

获取原文
获取原文并翻译 | 示例
           

摘要

Texas State Highway 183 from Euless to Dallas/Fort Worth underwent a $1.6 billion major reconstruction in 2014. On projects of this size, even small changes can lead to a great deal of extra work. Such was the case when an unexpected grade change was required to correct drainage issues. "It was a surprise; the road was raised up to 4 inches after utility manholes had been installed," says Jonathan White, operations manager at Cheyenne Construction Co. of Mansfield, Texas, a concrete subcontractor for the project. "That meant that 300 to 400 manholes needed to be uncovered and raised to grade."
机译:从Euless到达拉斯/沃思堡的德克萨斯州道183号公路在2014年进行了16亿美元的重大改建。在如此规模的项目上,即使很小的变化也可能导致大量的额外工作。当需要进行意料之外的坡度更改以纠正排水问题时就是这种情况。该项目的混凝土分包商,得克萨斯州曼斯菲尔德的Cheyenne Construction Co.运营经理乔纳森·怀特(Jonathan White)说:“这很令人惊讶;在安装了公用人孔之后,道路被抬高了4英寸。” “这意味着需要发现300至400个沙井并提升等级。”

著录项

  • 来源
    《Public works》 |2015年第1期|48-49|共2页
  • 作者

    Angus W. Stocking;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号