Mega-Events and Rapid Transit: Evaluating the Canada Line 10 Years After Vancouver 2010

机译:Mega-Events和迅速过境:2010年温哥华10年后评估加拿大第10段

获取原文
获取原文并翻译 | 示例
           

摘要

This article examines the Canada Line rapid rail transit project in Vancouver, British Columbia, a decade after its completion and the 2010 Winter Olympic Games for which it was accelerated. The case resides at the intersection of two project classes with well-documented patterns of underperformance: transit mega-projects and sporting mega-events. Beyond connecting a number of Vancouver 2010 venues, the Canada Line is notable for its use of a public-private partnership procurement (PPP) model, as well as the significant real estate development seen nearby. In particular, the article focuses on outcomes classified under three headings: procurement model, community impact, and land use impact. Prior to providing avenues for future research, this article finds that while the PPP model avoided substantial cost overrun risks, the lucrative operational concession was where the growth coalition pushing the project was able to make it sufficiently attractive for private partners, while externalizing cost on third-parties.
机译:本文介绍了不列颠哥伦比亚省温哥华的加拿大线路快速铁路运输项目,这是2010年冬季奥运会的完成之后。案件驻留在两个项目课程的交叉点,具有良好的表现形式模式:运输超级项目和体育巨型活动。除了连接多个温哥华2010场地之外,加拿大线是由于其使用公私伙伴关系采购(PPP)模型,以及附近所见的重要房地产开发。特别是,本文重点介绍了三篇标题分类的结果:采购模型,社区影响和土地利用影响。在为未来研究提供途径之前,本文发现,虽然PPP模型避免了大量成本超支风险,但利润丰厚的运营特许权,即推动该项目的增长联盟能够使其对私人合作伙伴充分吸引力,同时为第三种-派对。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号