...
首页> 外文期刊>Public Transport >Solving large scale crew scheduling problems in practice
【24h】

Solving large scale crew scheduling problems in practice

机译:在实践中解决大型机组调度问题

获取原文
获取原文并翻译 | 示例
           

摘要

This paper deals with large-scale crew scheduling problems arising at the main Dutch railway operator, Netherlands Railways (NS). NS operates about 30000 trains a week. All these trains need a driver and a certain number of guards. Some labor rules restrict the duties of a certain crew base over the complete week. Therefore, splitting the problem in several subproblems per day leads to suboptimal solutions.
机译:本文讨论了荷兰主要铁路运营商荷兰铁路公司(NS)出现的大规模机组调度问题。 NS每周运营约30000列火车。所有这些火车都需要驾驶员和一定数量的警卫。一些劳动法规限制了整个星期内某些船员的职责。因此,每天将问题分成几个子问题会导致解决方案欠佳。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号