首页> 外文期刊>Public roads >Resolving Conflict in Utility Management
【24h】

Resolving Conflict in Utility Management

机译:解决公用事业管理中的冲突

获取原文
获取原文并翻译 | 示例
           

摘要

Unknown utility conflicts on a highway project can result in increased risks to highway contractors, which translate into higher bids, increased hazards for highway workers and the public, and potential cost increases and delays during the construction of a project. The inability to obtain reliable underground utility information has long been a troublesome problem for highway designers across the United States. To address the issue, some States have implemented a process of conducting subsurface utility investigations to accurately identify the location of these utilities. This engineering practice is known as subsurface utility engineering (SUE). The proper and successful use of SUE benefits both highway agencies and the impacted utilities, avoiding unnecessary utility relocations, eliminating conflicts with utilities, and enhancing safety.
机译:公路项目的未知效用冲突可能会导致公路承包商的风险增加,这些风险转化为更高的出价,增加了对公路工人和公众的危害,以及在项目建设期间的潜在成本增加和延误。无法获得可靠的地下实用信息长期以来一直是美国公路设计师的麻烦问题。为了解决这个问题,一些国家已经实施了进行地下公用事业调查的过程,以准确识别这些公用事业的位置。该工程实践被称为地下公用事业工程(SUE)。苏的适当和成功使用苏均享有高速公路机构和受影响的公用事业,避免不必要的实用程序重新定位,消除与公用事业冲突以及加强安全性。

著录项

  • 来源
    《Public roads》 |2020年第3期|34-35|共2页
  • 作者

    GAY DUGAN; AMBER CLARK;

  • 作者单位

    NHI;

    NHI;

  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号