首页> 外文期刊>Fortschritt-Berichte VDI-Zeitschriften >From BIM requirements to facility management BIM process scenario in a hospital building
【24h】

From BIM requirements to facility management BIM process scenario in a hospital building

机译:从BIM要求到医院大楼中的设施管理BIM过程场景

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

The Research Programme aimed to investigate how to manage a Building Information Model in order to begin the Outline Design Stage with the Facilities Management in mind. The Research Group, belonging to Politecnico di Milano and Universita degli Studi di Brescia, closely co-operated with a large Italian Contractor, CMB. A case study has been exploited dealing with the refurbishment and extension of hospitals located into the Lombardy Region.
机译:该研究计划旨在调查如何管理建筑信息模型,从而在考虑设施管理的前提下开始大纲设计阶段。该研究小组隶属于米兰理工大学和布雷西亚大学大学,并与一家大型意大利承包商CMB密切合作。利用了一个案例研究来处理伦巴第地区医院的翻新和扩建。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号