Understanding political institutional support for completing the Mochovce nuclear power plant

机译:了解完成Mochovce核电站的政治制度支持

获取原文
获取原文并翻译 | 示例
           

摘要

Completion of the Slovak Mochovce nuclear power plant (NPP) is expected around 2020, almost forty years after its start. This is an overview of the project's political and policy background. It identifies how the government supported the project, and evaluates the democratic legitimacy of that support. The analysis draws on and summarises a large data set and other information, gathered from a wide range of official and academic sources, press agencies and non-governmental organisations (NGOs). The results show that the Slovak authorities applied significant institutional political pressure to promote the project, and supported its completion by circumventing the legal rights of NGOs to transparency and participation in project permit procedures. The results also explain the context and rationale of measures used to limit the contributions from the Mochovce NPP operation to the Nuclear Decommissioning Fund, and also used to shift part of nuclear decommissioning costs from industry and government onto consumers of non-nuclear generated electricity. In the conclusion the key results are reviewed in the context of institutional recreancy and the theory and practise of regulatory capture.
机译:斯洛伐克Mochovce核电站(NPP)预计在2020年左右建成,距核电站启动已近40年。这是该项目的政治和政策背景的概述。它确定了政府如何支持该项目,并评估了这种支持的民主合法性。该分析利用并总结了从广泛的官方和学术来源,新闻机构和非政府组织(NGO)收集的大量数据集和其他信息。结果表明,斯洛伐克当局施加了巨大的机构政治压力来推动该项目,并通过绕开非政府组织的透明度和参与项目许可程序的合法权利来支持该项目的完成。结果还解释了用于限制Mochovce核电厂运行向核退役基金捐款的措施的背景和理由,还用于将部分核退役成本从工业和政府转移到非核发电用户。在结论中,主要结果是在机构娱乐性以及监管俘获的理论和实践的背景下进行审查的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号