...
首页> 外文期刊>Progress in Natural Science >Allocation of power generating and shipping of Hanjiang upstream cascade
【24h】

Allocation of power generating and shipping of Hanjiang upstream cascade

机译:汉江上游梯级发电和航运的分配。

获取原文
获取原文并翻译 | 示例
           

摘要

The optimal model and simulating model of the Hanjiang cascade reservoirs operation with one day as its calculating period are established to coordinate the contradictions between power generating and shipping. The optimal model is solved by progressive op-timality algorithm method adopting the theory of large system decomposing and coordinating. By analyzing the water allocation results obtained from six schemes, which are two cascades, four cascades and seven cascades joint operation considering shipping or not, the contradiction degree between power generating and shipping is investigated and some joint operation schemes are proposed.
机译:建立了以一天为计算周期的汉江梯级水库调度的优化模型和仿真模型,以协调发电与航运之间的矛盾。采用大系统分解与协调理论,通过渐进优化算法求解最优模型。通过分析从两个方案,两个梯级,四个梯级和七个梯级的联合运行中考虑配水与否的配水方案的结果,研究了发电与运输之间的矛盾程度,提出了联合配水方案。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号