Contract Issues & Construction Safety Management

机译:合同签发与施工安全管理

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

The U.S. construction industry is a litigious industry, spending from $4 to $12 billion annually on dispute resolution (Gebken Ⅱ, 2006). A recent study found that the average cost of individual disputes in the U.S. construction in- Idustry during 2011 was $10.5 million. Furthermore, the average length of time required to resolve each dispute was 14.4 months (EC Harris, 2012). In addition to the time and dollars expended, disputes inevitably damage relationships between project team members.
机译:美国建筑业是一个诉讼行业,每年在争端解决上的支出为4到120亿美元(GebkenⅡ,2006年)。最近的一项研究发现,2011年美国建筑行业中个人纠纷的平均成本为1050万美元。此外,解决每个争议所需的平均时间为14.4个月(EC Harris,2012年)。除了花费时间和金钱之外,纠纷不可避免地破坏了项目团队成员之间的关系。

著录项

  • 来源
    《Professional safety》 |2013年第9期|56-61|共6页
  • 作者单位

    safety and health management program within the Engineering Technologies, Safety and Construction Department at Central Washington University;

    safety and health management program within the Engineering Technologies, Safety and Construction Department at Central Washington University;

    safety and health management program within the Engineering Technologies, Safety and Construction Department at Central Washington University;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号