...
首页> 外文期刊>Professional engineering >Areva and Westinqhouse reactor designs fail to shine
【24h】

Areva and Westinqhouse reactor designs fail to shine

机译:阿海珐和威斯汀豪斯反应堆的设计未能脱颖而出

获取原文
获取原文并翻译 | 示例
           

摘要

The hse has identified unresolved issues over designs of the new nuclear reactors that could cause approval delays.rnProblems were highlighted last week in the update on the progress of the Generic Design Assessment (GDA). In the document the HSE expressed concern over slow progress and lack of detail.rnThe GDA process, to be completed by June 2011, is a detailed examination of French firm Areva's EPR and Japanese-owned Westing-house's AP1000 designs. The GDA's aim is to speed uprnnuclear new-build by identifying potential problems before construction starts.
机译:这些已经确定了新核反应堆设计中尚未解决的问题,可能会导致批准延迟。rn上周,在通用设计评估(GDA)进展的更新中着重指出了问题。 HSE在文件中对进展缓慢和缺乏细节表示关注。rnGDA程序将于2011年6月完成,是对法国公司Areva的EPR和日本拥有的西屋公司的AP1000设计的详细检查。 GDA的目的是通过在施工开始之前识别潜在问题来加速核新建筑的建造。

著录项

  • 来源
    《Professional engineering》 |2009年第19期|4|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号