...
【24h】

Places Faces

机译:放置面孔

获取原文
获取原文并翻译 | 示例

摘要

Pass Ltd., an independent test equipment expert based in the United Kingdom, warns that many gas fitters and boiler engineers in the UK may be unaware of new mandatory regulations which will come into effect from April 2014 to measure and record the carbon monoxide (CO) level in the flue gas when a condensing boiler is commissioned. Barry Atkins, managing director of Pass, points out that Gas Safe Register issued Technical Bulletin 143 in July 2013, and urges gas fitters and boiler engineers to get up to speed with its process flowchart, which describes how flue integrity can be verified, how CO testing should be carried out, and when advice should be sought.
机译:Pass Ltd.是一家位于英国的独立测试设备专家,他警告说,英国的许多燃气装配工和锅炉工程师可能没有意识到新的强制性法规,该法规将从2014年4月开始生效,以测量和记录一氧化碳(CO )调试冷凝锅炉时烟气中的水平。 Pass的常务董事巴里·阿特金斯(Barry Atkins)指出,《气体安全登记册》于2013年7月发布了《技术公告143》,并敦促气体装配工和锅炉工程师紧紧掌握其工艺流程图,该流程图描述了如何验证烟道完整性,如何减少烟气排放。应进行测试,以及何时寻求建议。

著录项

  • 来源
    《Process Heating 》 |2014年第2期| 46-46| 共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号