首页> 外文期刊>日本建築学会计画論文集 >Study of the capacity of electricity resource and water supply equipment and the planning of water supply in an emergency
【24h】

Study of the capacity of electricity resource and water supply equipment and the planning of water supply in an emergency

机译:研究电力和供水设备的容量以及紧急情况下的供水计划

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

The main purpose of this research is the study of the building equipment facilities such as the supply of electricity and water in emergency in Tokyo. 1) There are many buildings with a self-generator for electricity supply and extremely few buildings with an own water supply equipment in time of suspension of electricity and water. 2)In normal time the air-conditioning operating rate is high but in time of an emergency the operating rate is low. The watersupply for the extinguish of fire and for sanitary is in and emergence about the same as in normal time. 3)The possession of building equipment and fuel storage, and activation for the rescue as well as the expected operation time in an emergency has been calculated.
机译:这项研究的主要目的是研究建筑设备设施,例如东京紧急情况下的电力和水供应。 1)在停水停电的时候,有许多带有自发电设备的建筑物,很少有带有自来水设备的建筑物。 2)正常情况下,空调的运转率较高,但在紧急情况下,运转率较低。灭火和卫生用的水与正常时间几乎相同。 3)计算了建筑设备和燃料存储的拥有量,以及在紧急情况下的救援激活和预期的运行时间。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号