首页> 外文期刊>Proceedings of the Institution of Mechanical Engineers >Wind energy resource assessment of Kuetahya, Turkey using WAsP and layout optimization
【24h】

Wind energy resource assessment of Kuetahya, Turkey using WAsP and layout optimization

机译:Kuetahya,土耳其利用WASP和布局优化的风能资源评估

获取原文
获取原文并翻译 | 示例
           

摘要

Kütahya is considered as a candidate region for a wind farm investment due to Turkey's 2023 energy targets and its proximity to other wind farm investments. In this study, two years of wind data collected from a hill near the Evliya Çelebi Campus of Kütahya Dumlupınar University was used to evaluate the wind farm potential of Kütahya. First, the wind speed, wind direction, wind shear, turbulence intensity and wind speed ramp characteristics were determined. Second, the WAsP software was used to create a wind atlas for the region. Three sites with strong wind potential were evaluated. A techno-economic analysis was conducted using five types of wind turbines selected from the WAsP database. Third, optimization of a wind farm layout was conducted by considering different hub height options for 14 commercial wind turbines using MATLAB software. It was shown theoretically that a wind farm with a power capacity of 25 MW can operate with a capacity factor of 35%. However, due to the relatively high topographical ruggedness index on the wind farm site, the calculated value for the capacity factor could not be reached in a real-life application.
机译:由于土耳其2023个能源目标及其与其他风电场投资的靠近,Kütahya被视为风电场投资的候选地区。在这项研究中,从Kütahyadumlupınar大学EvliyaÇelebi校区附近的一座山上收集了两年的风数据,用于评估Kütahya的风力源。首先,确定风速,风向,风剪,湍流强度和风速斜坡特性。其次,WASP软件用于为该地区创建风图集。评估了强风电位的三个站点。使用从WASP数据库中选择的五种类型的风力涡轮机进行技术经济分析。第三,通过考虑使用MATLAB软件的14个商用风力涡轮机的不同枢纽高度选择进行了风电场布局的优化。从理论上理论上表明,电源容量为25兆瓦的风电场可以以35%的容量率运行。然而,由于风电场网站上具有相对高的地形崎岖不平指数,因此无法在现实寿命应用中达到容量因子的计算值。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号