首页> 外国专利> Energy resource e.g. electric energy, allocation planning and optimizing method, involves determining resource quantity utilized in system or structure to realize specific process/task, and reevaluating future allocation of resources

Energy resource e.g. electric energy, allocation planning and optimizing method, involves determining resource quantity utilized in system or structure to realize specific process/task, and reevaluating future allocation of resources

机译:能源资源电能,分配计划和优化方法,涉及确定系统或结构中用于实现特定过程/任务的资源数量,并重新评估未来的资源分配

摘要

The method involves determining process types to be processed in a system and its main characteristics e.g. resource quantity. Tasks including the process types are determined, and a progress state of the process/tasks is qualified to determine whether the process/tasks are suppressed or realized. The task/process to be realized from nature and quantity and allocation of each task to a specific structure are estimated. The quantity utilized in the system or the structure to realize a specific process/task are determined. Future resource allocation to realize the process/task is reevaluated.
机译:该方法涉及确定要在系统中处理的过程类型及其主要特征,例如:资源数量。确定包括处理类型的任务,并且使处理/任务的进度状态合格以确定处理/任务是否被抑制或实现。从性质和数量以及要分配给特定结构的任务/过程中估算要实现的任务/过程。确定在系统或结构中用于实现特定过程/任务的数量。重新评估实现过程/任务的未来资源分配。

著录项

  • 公开/公告号FR2907943A1

    专利类型

  • 公开/公告日2008-05-02

    原文格式PDF

  • 申请/专利权人 POPSI CUBE SOCIETE A RESPONSABILITE LIMITEE;

    申请/专利号FR20060009386

  • 发明设计人 BEAUCHENE FABRICE;

    申请日2006-10-25

  • 分类号G06Q10/00;G06Q50/00;

  • 国家 FR

  • 入库时间 2022-08-21 19:47:09

相似文献

  • 专利
  • 外文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号