...
首页> 外文期刊>Proceedings of the Institution of Civil Engineers. Engineering Sustainability >Sustainable energy? A feasibility study for Eastside, Birmingham, UK
【24h】

Sustainable energy? A feasibility study for Eastside, Birmingham, UK

机译:可持续能源?英国伯明翰东区的可行性研究

获取原文
获取原文并翻译 | 示例
           

摘要

Eastside, a 130 ha brownfield site located to the eastern side of Birmingham's city centre, is undergoing social, economic and environmental changes, driven mainly through public and private investment estimated to be worth £6 billion. The regeneration programme is well under way and it aims to turn a once deprived inner-city area into the regions first 'sustainability quarter'. Achieving a sustainable quarter, in terms of energy, will require reductions to be made in energy demands compared to typical practice, for example through more thermally efficient buildings and utilisation of low-energy technologies. In addition it will require these demands to be met through renewable technologies rather than fossil fuels. This paper presents estimates for the total energy demands from the various developments planned within Eastside assuming typical and good-practice scenarios. The paper then assesses the feasibility of introducing various renewable energy supply technologies and combined heat and power (CHP) technologies in order to meet these demands. Finally the paper presents a simplified costing scheme for assessing the potential of renewable technologies to secure energy supplies while limiting carbon emissions. The renewable technologies are compared directly, aiming at providing an independent viewpoint for decision makers when considering which technologies to adopt. While the study focuses on Eastside, the lessons learned from this study are vitally important for redevelopment programmes being undertaken elsewhere.
机译:东区位于伯明翰市中心东侧,占地130公顷,位于棕地,正在经历社会,经济和环境的变化,主要是通过估计价值60亿英镑的公共和私人投资推动的。再生计划正在进行中,其目的是将曾经被剥夺的内城区变成该地区的第一个“可持续发展区”。要在能源方面实现可持续发展,将需要与常规做法相比减少能源需求,例如,通过提高热效率的建筑物和利用低能耗技术来实现这一目标。另外,将要求通过可再生技术而不是矿物燃料来满足这些要求。本文假设典型和良好实践的情况,给出了Eastside计划中的各种开发计划的总能源需求估算。然后,本文评估了引入各种可再生能源供应技术和热电联产(CHP)技术以满足这些需求的可行性。最后,本文提出了一种简化的成本核算方案,用于评估可再生技术在限制碳排放的同时确保能源供应的潜力。直接比较可再生技术,旨在为决策者在考虑采用哪种技术时提供一个独立的观点。虽然研究侧重于东边,但从该研究中汲取的教训对于在其他地方进行的重建计划至关重要。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号