Upgrade of London Underground Bridge D70: Chiswick Park

机译:伦敦地下桥D70的升级:奇斯威克公园

获取原文
获取原文并翻译 | 示例

摘要

Bridge D70 is a single-span steel plate girder bridge dating from the 1930s. It carries four tracks of London Underground's District and Piccadilly lines, the latter being one of the capital's main rail links to Heathrow Airport. Situated next to Chiswick Park tube station the bridge spans over a busy traffic route. This paper describes the project as part of the public private partnership contract to modernise the London Underground system. The paper describes the reasons why upgrading of the existing structure was chosen over complete renewal. The primary aims during the works were to avoid unnecessary closure of the railway line, to minimise the risk of unplanned disruption and to protect the safety of the travelling public. The paper explains the method of construction and the constraints on carrying out work to an existing bridge while in service to passenger trains. This required the extensive use of temporary works to support the tracks. It also describes the challenges in refurbishing a bridge in a residential area in terms of access to the site and reducing the environmental impact of the work. The designer and project manager was Metronet Rail SSL, and the main contractor was Edmund Nuttall (BAM Nuttall).
机译:D70桥是一座19世纪30年代的单跨钢板桥。它承载着伦敦地铁的区和皮卡迪利线的四线,后者是首都通往希思罗机场的主要铁路线之一。这座桥毗邻奇斯威克公园地铁站,横跨一条繁忙的交通路线。本文将该项目描述为公私合营合同的一部分,以使伦敦地铁系统现代化。本文描述了为什么选择现有结构的升级而不是完全更新的原因。工作期间的主要目的是避免不必要地关闭铁路线,以最大程度地减少计划外中断的风险,并保护旅行公众的安全。本文解释了施工方法以及在为旅客列车服务时对现有桥梁进行工程的限制。这需要大量使用临时工程来支撑轨道。它还描述了在住宅区翻新桥梁方面的挑战,包括进出场地和减少工作对环境的影响。设计师和项目经理是Metronet Rail SSL,主要承包商是Edmund Nuttall(BAM Nuttall)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号