Using tunnel boring data to augment the geological model

机译:使用隧道钻孔数据扩充地质模型

获取原文
获取原文并翻译 | 示例
           

摘要

A detailed borehole investigation has recently been undertaken for an extension to the Thames Water ring main in north London. Results of this were presented in a preconstruction geological model. This formed the basis for tunnel designers to assess ground conditions prior to construction and implement mitigation design and/or contingency plans in the event of adverse geological conditions being encountered. Previous sections of the ring main were constructed using open-faced tunnelling techniques. These allowed for inspection and continuous record of ground conditions at the tunnel face, enabling an identification of the geology and prediction of potentially adverse ground ahead. In facilitating such close geological supervision, tunnelling benefited from significant programme savings - in particular, a reduction of risk to the health and safety of underground personnel. In constructing the tunnel extension, a closed-face tunnel boring machine was opted for; this largely concealed the exposure of geology in situ during the excavation cycle. Apart from a limited number of tunnel face inspections, an indication of the geology was formed from observation and logging the spoil arising from the tunnelling machine, aided by an assessment of the performance of the machine itself in response to changes in geology over the alignment. These activities were necessary in validating the preconstruction geological model and in providing assurances to the on-site design and construction teams.
机译:最近已经进行了详细的钻孔研究,以扩展伦敦北部的泰晤士水环网。结果显示在施工前的地质模型中。这为隧道设计人员在遇到不利地质条件的情况下评估施工前的地面条件以及实施缓解设计和/或应急计划奠定了基础。环形干线的先前部分是使用开放式隧道技术构造的。这些可以检查并连续记录隧道工作面的地面状况,从而能够识别地质情况并预测前方潜在的不利地面。为了促进这种紧密的地质监督,隧道工程受益于大量的计划节省,尤其是降低了地下人员的健康和安全风险。在建造隧道扩建部分时,选择了封闭式隧道掘进机。这在很大程度上掩盖了开挖周期中地质的暴露。除了进行有限数量的隧道工作面检查外,还通过观察和测井隧道掘进机产生的弃渣来形成地质指示,并根据掘进机对地质变化的响应来评估掘进机本身的性能。这些活动对于验证施工前的地质模型并向现场设计和施工团队提供保证是必要的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号