A new tunnel fire safety evaluation and upgrading procedure was developed to replace the current seriously flawed 'additive' methodology. Such a procedure is necessary given the number of recent tunnel fires with serious consequences to human life, structure and the wider socio-economy. The procedure takes a holistic integrated approach and follows a critical path. The new methodology, called Upgrade, was tested for a hypothetical 'basic' example tunnel and showed its ability and flexibility in providing the risks and economic impacts for different upgrading options singly and in combination. The assessment shows clearly that it is not just safety features that are critical to results but also items such as the location of the fire and its size. The model is also applied to a 'real' alpine tunnel case to demonstrate that the smoke extraction system would have been justified by the holistic upgrading procedure. Both the development of Upgrade and the appraisal of socio-economic impact are key innovations of this work. Tunnel closure times were found to have a marked, even dominant, influence on human safety and especially the socio-economic impact. Closure times should therefore be reduced to a minimum by judicial selection of a combination of safety features that require night closures or part closure coupled with a reduced overall time for upgrading work. The work was carried out as part of the Uptun (Upgrading tunnels) 5th framework European Union (EU) project. The results of this work are aimed at assisting the EU develop a directive for road tunnel safety.
机译:开发了一种新的隧道消防安全评估和升级程序,以替代当前存在严重缺陷的“添加剂”方法。鉴于最近发生的隧道火灾数量众多,对人类的生活,结构和更广泛的社会经济造成了严重后果,因此必须采取这种程序。该程序采用整体集成方法,并遵循一条关键路径。新方法称为“升级”,已针对假设的“基本”示例隧道进行了测试,显示了其能力和灵活性,可以单独或组合地为不同的升级选项提供风险和经济影响。评估清楚地表明,对结果至关重要的不仅是安全功能,还包括火的位置及其大小等项目。该模型还应用于“真实”高山隧道案例,以证明烟雾抽排系统应通过整体升级程序来证明是合理的。升级的发展和社会经济影响的评估都是这项工作的关键创新。人们发现,隧道关闭时间对人的安全,尤其是社会经济影响具有显着,甚至主要的影响。因此,应通过司法选择需要夜间关闭或部分关闭的安全功能组合以及减少的升级工作总时间来将关闭时间降至最短。这项工作是欧盟(EU)第五框架Uptun(升级隧道)的一部分。这项工作的结果旨在帮助欧盟制定道路隧道安全指令。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号