首页> 外文期刊>Proceedings of the Institution of Civil Engineers >Delivering the Emirates Air Line, London, UK: design and construction of the steel main towers
【24h】

Delivering the Emirates Air Line, London, UK: design and construction of the steel main towers

机译:交付英国伦敦的阿联酋航空:设计和建造钢制主塔

获取原文
获取原文并翻译 | 示例
           

摘要

This paper presents the design, fabrication and erection process of the three main towers of the Emirates Air Line cable car, which spans the River Thames in London, UK. The towers consist of geometrically complex arrangements of a circular hyperboloid shaft topped by a tapering elliptical hyperboloid head. The shafts are formed of interlocking, alternatively and differently pitched, spiralling, doubly curved, structural steel plate elements of varied typologies. The paper presents the extraordinary technical demands including the plate forming process, the complex array of loadings, the nature of the wind responses investigated including impacts of aerodynamic effects from cyclic wind loading, specific requirements for advanced connection stiffness modelling to ensure the extremely tight movement criteria, the challenges of erection over the river Thames and the details of site assembly to tight tolerances. This paper is one of a series of four which describe the delivery of the Emirates Air Line project.
机译:本文介绍了横跨英国伦敦泰晤士河的阿联酋航空缆车的三座主要塔的设计,制造和安装过程。这些塔由圆形双曲面竖井的几何形状复杂的布置组成,顶部是锥形的椭圆双曲面头。轴由各种类型的互锁,交替且不同间距,螺旋,双弯曲的结构钢板元件形成。本文提出了非凡的技术要求,包括板成形工艺,复杂的载荷阵列,所研究的风响应的性质(包括循环风载荷对空气动力学影响的影响),高级连接刚度建模的特定要求,以确保极紧的运动准则,在泰晤士河上架设的挑战以及对严格公差的现场组装细节。本文是描述阿联酋航空项目交付情况的四个系列之一。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号