...
首页> 外文期刊>Proceedings of the Institution of Civil Engineers >Design and top-down construction at the Nanjing Youth Olympic Center, China
【24h】

Design and top-down construction at the Nanjing Youth Olympic Center, China

机译:中国南京青年奥林匹克中心的设计和自上而下的建设

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

This paper describes the design and top-down basement construction of Nanjing Youth Olympic Center in Nanjing, China. The building's twin towers are 315 m high and are among the tallest to have had their basements constructed top-down. Designed and built for the Nanjing 2014 Youth Olympic Games, the structure was completed in just 20 months. Top-down construction was selected by the design engineer, along with various new techniques and developments of existing methods, to save time and improve safety. This paper describes the site conditions and structural design process, followed by the sequence of top-down basement construction. The design details of the diaphragm wall, foundations, columns, basement excavation and vertical load transfer are also presented. The paper aims to provide a reference for those using top-down construction on tall buildings.
机译:本文介绍了南京南京青年奥林匹克中心的设计和自上而下的地下室建设。该建筑的双子塔高315 m,是自上而下建造地下室的最高塔。该结构是为2014年南京青年奥林匹克运动会设计和建造的,仅用了20个月便完成了施工。设计工程师选择了自上而下的结构,以及各种新技术和现有方法的发展,以节省时间并提高安全性。本文介绍了场地条件和结构设计过程,然后介绍了自上而下的地下室施工顺序。还介绍了隔膜墙,地基,圆柱,地下室开挖和垂直荷载传递的设计细节。本文旨在为那些在高层建筑中使用自顶向下的建筑提供参考。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号