首页> 外文期刊>Proceedings of the Institution of Civil Engineers >Re-visiting Bragg to keep UK's temporary works safe under EuroNorms
【24h】

Re-visiting Bragg to keep UK's temporary works safe under EuroNorms

机译:重新访问布拉格,以确保英国在EuroNorms下的临时工程安全

获取原文
获取原文并翻译 | 示例
           

摘要

Major failures of UK temporary works have almost disappeared since BS 5975 was published in 1982, following the Bragg report in 1975 into recent falsework disasters in which many lost their lives. But with the replacement of British standards by EuroNorms, could such failures inevitably recur? BS 5975 is 'British' in style: its comprehensive guidance appeals to reasonableness and the exercise of judgement. Not every detail of site operations can be foreseen in the design office, so coordinating the inter-relationship between designer and constructor is critical. This contrasts with the style of the EuroNorms, in which reliance is placed on highly analytical methods and low factors of safety. The paper compares BS 5975 in detail with the EuroNorm for falsework, BS EN 12812, expressing concern about the dependence on analysis and the absence of guidance on procedural control. The introduction of the structural Eurocodes also presents a fundamental challenge to the construction industry. At a time when those who grew up with Bragg are retiring from the industry, the paper re-visits Bragg's recommendations and sets a fresh agenda to maintain and improve safety in the industry as the EuroNorms are adopted.
机译:自1982年发布BS 5975以来,英国临时工程的主要故障几乎消失了,这是因为1975年布拉格的报告导致了最近的虚假灾难,其中许多人丧生。但是,用EuroNorms取代英国标准后,难免会再次发生这种失败吗? BS 5975的样式为“英国”:其全面的指南呼吁合理性和判断力。并不是在设计部门就可以预见到站点操作的每个细节,因此协调设计人员与构造人员之间的相互关系至关重要。这与EuroNorms的风格形成鲜明对比,后者依靠高度分析的方法和低安全系数。本文将BS 5975与EuroNorm的虚假工作详细进行了比较,BS EN 12812,表达了对分析的依赖以及对程序控制缺乏指导的关注。结构性欧洲规范的引入也对建筑业提出了根本性挑战。当与Bragg一起成长的人退出该行业时,该论文重新审视了Bragg的建议,并制定了新的议程,以在采用EuroNorms时保持和改善行业安全。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号