首页> 外文期刊>Proceedings of the institution of civil engineers >Life-cycle assessment applied to construction of Thames Tideway east tunnel, London, UK
【24h】

Life-cycle assessment applied to construction of Thames Tideway east tunnel, London, UK

机译:生命周期评估应用于英国伦敦泰晤士河潮汐东隧道的建设

获取原文
获取原文并翻译 | 示例
       

摘要

The Thames Tideway tunnel is a large sewer running up to 66 m below the tidal river Thames in London, UK. Its construction, started in 2016, was urgently needed to protect the tidal Thames from pollution due to the combined sewer overflows of untreated sewage that every year are spilled into the river. This paper reports on an exercise for evaluating the environmental impact associated with the construction process of the east section of the tunnel quantified by means of a life-cycle assessment, which not only primarily considered carbon dioxide emissions, but also took into account a wider series of impact categories. Operational and decommissioning impacts were not included. The results indicated the processes with the greatest effects on the environmental performance of the east sector construction and hence where alternatives on the design or materials used needed to be considered.
机译:泰晤士河Tideway隧道是一条大型下水道,在英国伦敦的泰晤士河泰晤士河下方延伸至66 m。由于每年未经处理的污水的下水道合流溢出,每年都涌入河中,因此迫切需要建造于2016年的工程,以保护潮汐泰晤士河免受污染。本文报告了一项评估生命周期评估量化的隧道东段施工过程对环境影响的练习,该评估不仅考虑了二氧化碳排放,还考虑了更广泛的系列影响类别。不包括运营和退役影响。结果表明这些过程对东部地区建筑的环境性能影响最大,因此需要考虑设计或材料的替代方案。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号