...
首页> 外文期刊>Proceedings of the Institution of Civil Engineers >Delivery of a 40 m long fibre-reinforced polymer composite footbridge in Madrid, Spain
【24h】

Delivery of a 40 m long fibre-reinforced polymer composite footbridge in Madrid, Spain

机译:在西班牙马德里交付40 m长的纤维增强聚合物复合材料人行桥

获取原文
获取原文并翻译 | 示例
           

摘要

This paper describes the design, manufacture, installation and load testing of a 40 m long urban footbridge over the River Manzanares in Madrid, Spain. The main structure of the footbridge consists of a fibre-reinforced polymer girder. The girder was manufactured in a workshop using the resin-infusion process, which is normally used to manufacture fibreglass boat hulls. Potential problems that can arise in the manufacture of such elements are highlighted in the paper and the strategies adopted to cope with them are illustrated. The girder was transported by truck to the site where it was lifted onto reinforced concrete supports. The results of the static and dynamic load tests carried out after completion of the pedestrian bridge are presented.
机译:本文介绍了西班牙马德里曼萨纳雷斯河上40 m长的城市人行天桥的设计,制造,安装和载荷测试。行人天桥的主要结构由纤维增强的聚合物梁组成。大梁是在车间使用树脂灌注工艺制造的,该工艺通常用于制造玻璃纤维船体。本文强调了在制造此类元件时可能出现的潜在问题,并说明了应对这些问题所采取的策略。大梁通过卡车运输到现场,然后将其吊到钢筋混凝土支架上。给出了人行天桥完工后进行的静态和动态载荷测试的结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号