首页> 外文期刊>Proceedings of the Institute of Marine Engineering, Science and Technology >Submarine power cables: laying procedure, the fleet and reliability analysis
【24h】

Submarine power cables: laying procedure, the fleet and reliability analysis

机译:海底电缆:敷设程序,船队和可靠性分析

获取原文
获取原文并翻译 | 示例
           

摘要

This paper investigates the possible problems of laying submarine power cables (SPC). It provides information about the power cables themselves, the laying procedure, and the respective fleet. It also describes the medium voltage (MV) transmission grid in Greece and determines the correlation of different parameters that affect the operation of the network. Furthermore, a reliability analysis, based on a statistical model, is conducted; the model is used to evaluate the operational characteristics of cables, such as the rate of failures from natural or human causes, and is also used to choose between different candidate cable routes in order to determine the one with the maximum reliability.
机译:本文研究了铺设海底电力电缆(SPC)可能存在的问题。它提供有关电源电缆本身,敷设程序以及相应机群的信息。它还描述了希腊的中压(MV)输电网,并确定了影响网络运行的不同参数的相关性。此外,基于统计模型进行可靠性分析。该模型用于评估电缆的运行特性,例如自然或人为原因造成的故障率,还可以在不同的候选电缆路径之间进行选择,从而确定可靠性最高的电缆。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号