...
首页> 外文期刊>Proceedings of the IEE - Part A: Power Engineering >The design of the 330 kV transmission system for Rhodesia
【24h】

The design of the 330 kV transmission system for Rhodesia

机译:罗得西亚330 kV输电系统的设计

获取原文
获取原文并翻译 | 示例

摘要

The Kariba Gorge hydro-electric scheme now under construction by the Federal Power Board of Rhodesia and Nyasaland will provide the power for a major increase in electrification in the Federation. Outputs of 1200 MW and 8000 GWh per annum or more can be generated, and a 330 kV system is being built to transmit the power to the consuming centres over distances of above 300 miles. The paper outlines the conditions governing the design of the system, describes the steps taken to select the system voltage and other main features, and discusses some of the factors affecting the characteristics and design of the equipment.
机译:罗得西亚和尼亚萨兰联邦电力局目前正在建设的卡里巴峡谷水力发电计划将为联邦电气化的大增提供动力。每年可产生1200 MW和8000 GWh或更高的输出,并且正在构建330 kV系统,以在300英里以上的距离上将电能传输到消耗中心。本文概述了控制系统设计的条件,描述了选择系统电压和其他主要功能的步骤,并讨论了影响设备特性和设计的一些因素。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号