Operational experience at Calder Hall

机译:Calder Hall的运营经验

获取原文
获取原文并翻译 | 示例

摘要

The paper describes the programme carried out to commission and operate the Calder Hall nuclear power station from the time when reactor No. 1 was taken over by the operations branch in May, 1956, until the complete unit was on line at full power. Detail of the methods of carrying out particular aspects of the experimental work is left for other authors; the emphasis in this paper is on the relevance of the tests and their results to the successful operation of the Calder Hall project in particular and the prospects for nuclear generation of power in general. It also indicates the type of work and problem which operation of nuclear power stations will entail.
机译:该文件描述了从1956年5月,第一分支反应堆被操作分支机构接管到整个装置全功率投入运行之时,试运行和运行Calder Hall核电站的程序。进行实验工作的特定方面的方法的细节留给其他作者。本文的重点是这些测试及其测试结果与Calder Hall项目成功运行的相关性,尤其是核能发电的前景。它还指出了核电站运行将涉及的工作类型和问题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号