Leaning Low-to-Medium-Volume High-Level Assembly Processes

机译:倾斜的中小批量高级装配过程

获取原文
获取原文并翻译 | 示例
       

摘要

LOW-TO-MEDIUM-VOLUME HIGH-LEVEL ASSEMBLY (HLA) projects are often the most inefficient projects in electronics manufacturing services (EMS). While the work cell areas may be efficiently arranged for actual assembly operations, HLA projects are normally built in tucked away areas where there is space for a project that may not be built every day. There isn't a huge of amount of optimization effort beyond initial setup because the payback on a single project typically doesn't justify it. And, since these projects are added infrequently, often as an additional requirement from a customer with higher volume work, they are often set up in whatever space is available when the need arises.
机译:中小批量高组装(HLA)项目通常是电子制造服务(EMS)中效率最低的项目。虽然可以有效地安排工作单元区域以进行实际的组装操作,但HLA项目通常建在隐蔽的区域,那里有空间可能不是每天都会建造的。除了初始设置外,没有大量的优化工作,因为单个项目的投资回报通常无法证明其合理性。而且,由于这些项目很少添加,通常是由于工作量较大的客户提出的附加要求,因此通常会在需要时在可用的任何空间中进行安装。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号