首页> 外文期刊>Printed Circuit Design & Manufacture >Why Was My PCB Job Put on Hold?
【24h】

Why Was My PCB Job Put on Hold?

机译:为什么我的PCB工作持有?

获取原文
获取原文并翻译 | 示例
       

摘要

WHEN A CUSTOMER learns their much-needed PCB job has inexplicably gone into the dreaded "hold" bas-ket, the instinctive response is indignation. Let's take a moment to examine the possible reasons. After all, the fabricator doesn't want an unhappy customer, nor a pause in work volume. Yet, a great deal of precise data is needed to build a printed circuit board. As layer count and complexity increase, so does the volume of correct information needed by the fabricator to prop-erly manufacture the job. If some necessary data are missing, the CAM operator will hand the file back to sales to sort out the problems. The one steadfast rule all PCB manufacturing facilities hold dear is "we don't guess." Never. Break that rule and the consequences will bite back hard. To ensure no one is guessing, every question must be answered. If you failed to specify a tolerance on a set of holes, the job will go on temporary hold until the CAM operator can get a suitable answer. If you have an electrical short between ground power layers due to a misplaced via, the job goes back to sales to sort out. When a job is on hold for a serious problem, the result can be days of delay. If there are one or two small issues, however, in many instances the CAM operator or sales will call and sort it out. They might be able to move a trace or two to prevent a short, for example, or change a pad size to correct a problem with an annual ring that is too small. However, the CAM operator must meet a quota of jobs each day to keep the manufacturing facility fully loaded. They do not have an abundance of time to fix a multitude of problems in an individual customer's data. Other jobs are waiting! In that case, the CAM operator hands the file back to sales to reject the data. The customer can then fix it and resubmit it through the whole process of price quote, DRC (design rule check) and setup.
机译:当客户学习其急需的PCB作业时,莫名其妙地进入可怕的“持有”Bas-Ket,本能反应是愤慨。让我们花点时间来检查可能的原因。毕竟,制造商不希望难以满意的客户,也不需要在工作卷中暂停。然而,需要大量的精确数据来构建印刷电路板。作为层数和复杂性增加,制造商所需的正确信息的体积也是如此,使得妥协制造工作。如果缺少一些必要的数据,则CAM操作员将将文件交回销售以解决问题。一定的坚定规则所有PCB制造设施都认为亲爱的“我们不猜”。绝不。打破这个规则,后果将咬回来。为了确保没有人猜测,必须回答每个问题。如果您未能在一组孔上指定容差,则作业将继续临时保持,直到CAM操作员可以获得合适的答案。如果由于通过错位通过误差层之间的电气短路,则作业将返回销售。当作业持有严重问题时,结果可能是延迟的日子。但是,如果有一个或两个小问题,在许多情况下,凸轮操作员或销售将调用并将其调用。它们可能能够移动迹线或两个以防止短暂的,例如或改变焊盘大小以纠正一个太小的年环的问题。但是,凸轮操作员必须每天满足职位的配额,以保持制造工厂完全加载。他们没有丰富的时间来修复个人客户数据中的多个问题。其他工作正在等待!在这种情况下,CAM操作员将文件重新返回销售以拒绝数据。然后,客户可以通过价格报价,DRC(设计规则检查)和设置来解决它并重新提交它并重新提交。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号