Accelerated Construction of Short Span Railroad Bridges in Iran

机译:加快伊朗短跨度铁路桥梁的建设

获取原文
获取原文并翻译 | 示例
           

摘要

A comparison is made between the three conventional methods used for accelerated bridge construction (ABC) of railroad bridges in Iran: single-piece deck installation by heavy cranes, multisegment deck installation by cranes, and single-piece deck installation by the so-called roll-in or sliding method. Both the safety of the construction and the serviceability of the railway line during the construction process are the main factors influencing the appropriate alternatives. Four railroad bridge construction case studies are demonstrated and compared here. Based on the individual situations, it is shown that the use of the roll-in method, in comparison with installation by crane, can reduce the installation costs significantly, eliminate the fatigue-prone details of the steel connectors, and eliminate the time for concrete casting in conventional multisegment deck installations.
机译:对伊朗铁路桥梁的加速桥梁建设(ABC)的三种常规方法进行了比较:重型起重机的单层甲板安装,起重机的多段甲板安装以及所谓的轧辊单层甲板安装-in或滑动方法。在施工过程中,施工的安全性和铁路线的可服务性都是影响适当替代方案的主要因素。在此演示并比较了四个铁路桥梁施工案例研究。根据具体情况显示,与通过起重机进行安装相比,采用滚入方法可以显着降低安装成本,消除钢连接器易疲劳的细节,并节省混凝土的时间常规多段甲板安装中的铸造。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号