首页> 外文期刊>Power technology and engineering >EXPERIENCE WITH CONSTRUCTION OF 500 KV GAS INSULATED SWITCHGEAR AT THE VOTKINSK HYDROELECTRIC POWER PLANT
【24h】

EXPERIENCE WITH CONSTRUCTION OF 500 KV GAS INSULATED SWITCHGEAR AT THE VOTKINSK HYDROELECTRIC POWER PLANT

机译:沃特金斯克水力发电厂500 KV气体绝缘开关柜的建造经验

获取原文
获取原文并翻译 | 示例
           

摘要

As an inseparable part of the main electrical circuit of the Votkinsk Hydroelectric Power Plant (HPP), the electrical circuit of the 500 kV outdoor distribution system was developed at the end of the 1950's using equipment from that time. When the 500 kV outdoor distribution system was rebuilt, its switching equipment was worn out and obsolescent and the manufacturers had stopped providing spare parts, so that reliable operation of the equipment could not be ensured even with great repair expenditures.
机译:作为伏特金斯克水电站(HPP)主电路不可分割的一部分,从1950年代末开始使用设备开发了500 kV户外配电系统的电路。重建500 kV户外配电系统时,其开关设备已经陈旧过时,制造商已停止提供备件,因此即使有大量维修支出也无法确保设备的可靠运行。

著录项

  • 来源
    《Power technology and engineering》 |2017年第1期|20-22|共3页
  • 作者

    A. P. Deev;

  • 作者单位

    Votkinsk HPP, branch of JSC RusHydro, Russia;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号