首页> 外文期刊>Power technology and engineering >FILTRATION, PORE PRESSURE, AND SETTLING FROM CONSOLIDATION OF AN ULTRA-HIGH DAM
【24h】

FILTRATION, PORE PRESSURE, AND SETTLING FROM CONSOLIDATION OF AN ULTRA-HIGH DAM

机译:超大坝的固结过程中的过滤,孔隙压力和沉降

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Field observations of rock-earth dams lead to a recommendation that problems of filtration through the clay core of a dam should be solved using principles of unsteady flow (the Poisson equation). In many ways, the resulting solution changes the concept of filtration flow through the core. Settling during the construction period is compensated by adding additional soil.%National Research University 'Moscow State University of Civil Engi- neering,' Moscow, Russia;National Research University 'Moscow State University of Civil Engi- neering,' Moscow, Russia;National Research University 'Moscow State University of Civil Engi- neering,' Moscow, Russia;
机译:岩石大坝的现场观测结果提出了一个建议,即应使用非恒定流原理(泊松方程)解决通过大坝黏土心过滤的问题。在许多方面,最终的解决方案改变了流经岩心的过滤概念。在建设期间的沉降通过添加额外的土壤来补偿。%国立研究大学“莫斯科国立民用工程大学”,俄罗斯莫斯科;国立研究大学“莫斯科国立民用工程大学”,俄罗斯莫斯科;国家莫斯科国立工程大学研究型大学,俄罗斯莫斯科;

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号