首页> 外文期刊>Power Systems, IEEE Transactions on >Incorporating Wind Power in Generating Capacity Reliability Evaluation Using Different Models
【24h】

Incorporating Wind Power in Generating Capacity Reliability Evaluation Using Different Models

机译:在不同模型下将风电纳入发电容量可靠性评估

获取原文
获取原文并翻译 | 示例
           

摘要

Appropriate wind speed modeling is an important requirement in the reliability evaluation of wind integrated electric power systems. This paper examines and illustrates the effects on the generating capacity adequacy indices of a small test system of using different wind speed modeling procedures in Monte Carlo simulation and analytical reliability assessment. Wind speed data for a number of different time periods at two quite diverse locations in Canada are used in the studies. Wind speed is represented using hourly observed data, hourly mean wind speed data, autoregressive moving average (ARMA) time series, moving average (MA) time series, Normal distribution, and Markov chain models.
机译:在风能集成电力系统的可靠性评估中,适当的风速建模是一项重要要求。本文研究并说明了在蒙特卡洛模拟和分析可靠性评估中使用不同风速建模程序对小型测试系统的发电能力充足指标的影响。研究中使用了加拿大两个不同地点的多个不同时间段的风速数据。使用每小时观测数据,每小时平均风速数据,自回归移动平均(ARMA)时间序列,移动平均(MA)时间序列,正态分布和Markov链模型表示风速。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号