...
首页> 外文期刊>IEEE Transactions on Power Systems >Reserve margin planning in a wind-hydro-thermal power system
【24h】

Reserve margin planning in a wind-hydro-thermal power system

机译:风水热电系统中的备用金计划

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

A method for studying the effect of wind power on power system reserve margins, need of extra resources, etc. is presented. A conventional model for short-term operation planning for a hydrothermal power system is supplemented with a wind power model. The wind power model includes the forecast of total wind power generation and the uncertainty of the forecast. The conventional hydro-thermal model is extended to take into account load forecast uncertainty and reserve margins of the generation units. The requirements of instantaneous, fast, and slow reserves, depending on possible forced outages of thermal units and uncertain load and wind speed forecasts etc., are calculated together with the available capacities of the corresponding reserve type. The results include an estimation of whether there is a deficit or excess of instantaneous, fast, or slow reserves during each hour of the planning period. A numerical example shows an application of the method to the Swedish power system.
机译:提出了一种研究风电对电力系统备用余量,额外资源需求等的影响的方法。用于水热发电系统的短期运行计划的常规模型补充有风力模型。风电模型包括总风电发电量的预测和预测的不确定性。扩展了传统的水热模型,以考虑到负荷预测的不确定性和发电机组的备用余量。瞬时,快速和慢速储备的要求(取决于热量单元可能被迫中断以及不确定的负载和风速预测等)连同相应储备类型的可用容量一起计算。结果包括对在计划期间的每个小时内瞬时储备,快速储备或缓慢储备是否不足或过多的估计。数值示例显示了该方法在瑞典电力系统中的应用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号